Installation services

Build the right energy system.

From a complete Mycrogrid® to battery upgrades, we design and install around your property.

Start with the work you need.

Choose a complete new system, a battery-first installation, or added storage for an existing setup.

Best for adding storage for the first time

Lunar Energy modular Lunar System battery tower and Bridge installed on a Palm Desert home

Battery Only Installations

New battery storage sized around backup needs, daily use, and the property electrical system.

We review essential loads, available equipment space, electrical service, and any existing solar before designing and installing a new battery system.

Included in this path
  • Essential-load review
  • Battery and equipment layout
  • Electrical and transfer equipment
  • Permitting and installation
  • System testing and owner orientation
Explore battery-only installations

Best for an existing solar or battery system

FranklinWH battery add-on with two aPower 2 batteries, one aGate, and an existing Qcells rooftop solar array

Battery Add-Ons

Expand storage capacity or add compatible equipment to an existing energy system.

We inspect the installed system first, confirm compatibility and code requirements, then design the right expansion without guessing at what the existing equipment can support.

Included in this path
  • Existing-system inspection
  • Compatibility review
  • Capacity expansion plan
  • Code and permit review
  • Installation and recommissioning
Explore battery add-ons
Solar production modeling and roof layout used during system planning

A service starts with a design, not a box.

We model the property, equipment, loads, and existing system before finalizing what belongs in the scope.

Property-specificLayout and electrical conditions shape the plan.
Capacity with a reasonStorage follows the loads and operating goals.
Commissioned as a systemConnections and operating modes are tested before handoff.

Three paths, one accountable team.

The project scope changes. The planning, installation, and commissioning discipline does not.

Compare the scope Microgrid Installations Battery Only Installations Battery Add-Ons
Starting point New battery systemExisting solar or storage
Primary goal Backup and stored energyMore usable storage
Compatibility review Existing solar reviewedRequired before expansion
Commissioning Battery commissioningExpanded-system recommissioning

Designed before equipment reaches the wall.

Every service begins with the property and ends with a tested, explained system.

  1. Survey the property

    We review the electrical service, equipment locations, energy goals, and existing solar or storage.

  2. Engineer the scope

    The design defines equipment, capacity, loads, code requirements, and the work needed for a clean installation.

  3. Install and connect

    Our team coordinates permits, installation, electrical integration, and site details around the approved design.

  4. Test and hand off

    We commission the system, verify its operating modes, and show you how to use what was installed.

Not sure which service fits?

Bring us the property, current equipment, and the outcome you want. We will identify the right starting point.

Compatibility, final equipment selection, and project scope are confirmed after site review.